Features
size
size
conditioning
heating
date
- 2 or 3 Bed Apartments
- 100m from the beach
- 2024 Ready
- Parking Space
- Balcony
- Communal Pool
- 15 minutes from Airport
- Walk to Everything
Opportunity to purchase off-plan at this stunning beach development in Santa Pola just 15 minutes from Alicante airport and 100m from the beach. 2 or 3 bed apartments from just 230.000€
Modern closed residential complex consisting of homes with 2 and 3 bedrooms and 2 full bathrooms. The complex is made up of 3 apartment blocks with large garden common areas that include a swimming pool with water beds, a children’s play park, a pergola and bicycle parking.
Enjoy its spacious terraces, where you can relax, organize outdoor dinners and contemplate the most spectacular sunsets.
Contact us to receive more information and secure your place in this unique promotion just 100 meters from the beach!
Prices start at 230.000€ for a 2 bed 2 barth apartments and range up to 620.000€ from penthouse apartments.
Page 1 of 4
Building specifications
DESCRIPTION OF THE PROPERTIES
The development consists of three blocks of apartments. On the 1st to 4th floors there are
2 and 3-bedroom homes. The apartments on the 5th floor have a private solarium with
independent internal access to the roof. The properties are also available with 2 and 3
bedrooms.
DESCRIPTION OF THE COMMUNAL AREAS
The perimeter is enclosed with a concrete wall and security locks. It has pedestrian access
from the street Venida de la Virgen, and entrance to the building’s entrance hall of block 1
from Avenida Tamarit. The residence has green areas, an allocated area for bicycle parking
and a children’s play ground.
The swimming pool has a beach-type access, shower facilities and there is a large wooden
pergola. There are landscaped areas with palm trees and other vegetation, all of which is
illuminated. In the central part of the pool there is a shallower area where the water beds
are located.
FOUNDATION
The foundation is resolved by a reinforced concrete slab with HA-30/B/20/XA2 concrete
and B-500-S steel. This foundation has been calculated in accordance with the
specifications of the geotechnical study carried out on the plot and the new Structural
Code, Royal Decree RD 470-2021 of 29th June.
STRUCTURE
The load-bearing structure is made of reinforced concrete pillars HA-25/B/20/XC1 and
steel B-500-S, with the necessary dimensions and resistance for the project’s
requirements.
The horizontal structure is made up of reinforced concrete waffle slabs HA-25/B/20/XC1
and steel B-500-S, made up of reinforced concrete beams in two directions plus vibro-
pressed concrete coffer beams with a total thickness of 30 cm.Page 2 of 4
ROOF
Roofing with a flat walkable deck on the upper floor composed of slopes. An asphalt sheet
of elastomeric bitumen type LBM/40/FP, separating layer based on synthetic geotextile
felt, 8 cm thick extruded polystyrene tongue and groove board (XPS TYPE IV) with a
transmittance coefficient of 0.033 W/mK, new layer of synthetic geotextile felt, base for
flooring with 4 cm thick M-5 mortar and non-slip porcelain stoneware paving and artificial
grass according to design.
PRIVATE SOLARIUM
Private terrace with non-slip porcelain stoneware flooring and artificial grass according to
design.
Includes jacuzzi with reinforced structure, outdoor kitchen with sink, work area and
provision for a fridge. Equipped with outdoor shower with cold water supply.
FACADES
The building facade is made up of a multi-sheet construction system of 12 cm thick
ceramic brick partition wall, 8 cm thick EPS thermal insulation with a transmittance
coefficient of 0.029 W/mK, and 7 cm thick hollow ceramic brick partition wall inside. The
interior cladding is plastered with exposed gypsum plaster and the exterior with single-
layer mortar.
BRICKWORK AND INSULATION
The partition walls inside the dwellings separating rooms are made of 7 cm thick ceramic
bricks to be clad with M-5 cement mortar.
The separation between dwellings consists of a double 9 cm thick ceramic brick partition,
acoustic insulation between both partitions of 5 cm thick rock wool.
FLOORING AND TILING
The floors within the dwellings have acoustic insulation against impact noise under the
self-levelling mortar. This will be finished with large-format porcelain stoneware.
The exterior paving of common areas will be of anti-slip flooring in accordance with the
CTE (Technical Building Code).
The tiling in bathrooms will be done from floor to ceiling on a rendering of cement mortar
type M-5 with high quality ceramic tile or stoneware.Page 3 of 4
PLASTER AND PAINT
The dwellings have smooth plaster ceilings throughout the house with perimeter
plastering, which can be dismantled in bathrooms or wet areas that require it to house
installations.
Walls and ceilings are finished with smooth plastic paint.
CARPENTRY AND EXTERIOR GLAZING
The windows will be made of lacquered aluminium with thermal break, with sliding
windows in the living room and master bedroom and in the rest of the rooms. The
balconies have double glazing with air chamber with high-security glass and manual
shutters.
Armoured front door, with steel structure and frame, with blocking device, security lock
and peephole. The exterior is finished in white PVC sheeting and the interior in white
water-lacquered board.
INTERIOR CARPENTRY
White lacquered interior doors with spade hinges and soft closing system with rubber seal
on the frame. Wardrobes with sliding suspension doors, finished in white laminate, lined
on the inside with dividing shelves and hanging rail.
PLUMBING AND SANITARY WARE
Suspended toilet with built-in cistern. Top quality mixer taps. Shower trays made of resin
with mineral charge. Ventilation systems in bathrooms by ducts for forced extraction.
ELECTRICITY AND TELECOMMUNICATIONS
Electricity installations with high degree electrification (9.2 KW), top quality mechanisms,
TV sockets in living room, bedrooms and terrace, telecommunications sockets in living
room and bedrooms.
KITCHENS
The kitchens will be delivered fully furnished with upper and lower units, extractor hood
(cassette type), pre-installation for electrical appliances with COMPAC or similar type
worktop and embedded sink in worktop. Premium quality mixer taps.
AIR CONDITIONING/HOT WATER
Pre-installation of ducted air-conditioning system with Climaver Plus Aluminium 2-sided
Isover, refrigeration line using nitrogen with air-tightness test and adjustable and fixed
grilles. Outdoor unit will be installed on the roof.
Domestic hot water by aerothermal system with heat pump (Ariston ACS Nuos EVO 150 A⁺
or similar) with water accumulator and compressor installation installed on the roof.Page 4 of 4
PHOTOVOLTAIC PANELS
In order to improve energy efficiency, the properties have a photovoltaic panel with a 730
Wp microinverter, monitoring platform throughout an app. A 450 Wp panel on the roof,
which will allow energy savings in the property’s electricity consumption.
LIFTS AND STAIRS
Each block has two 6-passenger lifts, automatic doors, telephone connection and LED
lighting, which links the ground floor and the five apartment levels. There are also
staircases and exterior corridors that connect the building core with each of the flats.
PARKING SPACES
Each property has an allocated parking space situated as close as possible to its own block,
on the ground floor. The parking spaces are accessible through two remote-controlled
motorised access gates. The car park has provision for the future installation of a charging
point for electric vehicles from the individual meter of each of the properties, in
accordance with the regulations.